Preparation of a study on temporary traffic regulation
We highlight some of the studies we have produced:
PEDESTRIAN OVERPASS PUO ZIR ON THE A1 ZAGREB – SPLIT - DUBROVNIK HIGHWAY
CONSTRUCTION OF THE DRAINAGE SYSTEM FOR ECONOMIC ZONES IN THE AREA OF THE MUNICIPALITY OF KLINČA SELA
Simfonija prirode
SITUACIJA PRIVREMENE REGULACIJE
PROMETA
Gumb
RECONSTRUCTION OF ŠAŠKOVEČKA ULICA WITH CONSTRUCTION OF A SIDEWALK, FROM ULICA IVANA GORANA KOVAČIĆA TO VRBOVEČKA ULICA
Simfonija prirode
Situacija privremene regulacije prometa
Gumb
RECONSTRUCTION OF LOCAL ROAD NO. 33047 (ULICA OTONA KUČERE IN PETRINJA) WITH THE CONSTRUCTION OF A PEDESTRIAN WALKWAY, SECTION FROM KM 0,000 (D30) TO KM 1,700 (Ž3200), 1700 m IN LENGTH.
BUILDING: Reconstruction of D37 SECTION 001 (total length 6.8 km) and D30 (total length 1.5 km), PASSAGE THROUGH PETRINJA WITH CONSTRUCTION OF A PEDESTRIAN-CYCLING PATH
Simfonija prirode
Situacija privremene prometne regulacije za prvi segment
Gumb
Lica čovječanstva
Situacija privremene prometne regulacije za drugi segment
Gumb
Pijesak vremena
Situacija privremene prometne regulacije za treći segment
Gumb
Izvan granica
Situacija privremene prometne regulacije za četvrti segment
Gumb