Project creation in construction

We highlight some of the completed projects:

RECONSTRUCTION OF ŠAŠKOVEČKA ULICA WITH CONSTRUCTION OF A SIDEWALK, FROM ULICA IVANA GORANA KOVAČIĆA TO VRBOVEČKA ULICA

RECONSTRUCTION OF THE COUNTY ROAD ŽC3016 WITH CONSTRUCTION OF PEDESTRIAN WALKWAY, cadastral municipality of Helena, Donja Zelina, Blaževdol 

CONSTRUCTION OF A SIDEWALK IN A SECTION OF ULICA LJUDEVITA GAJA, FROM ULICA KSAVERA ŠANDORA ĐALSKOG TO ULICA JOSIPA KOZARCA

RECONSTRUCTION OF AVENIJA VEĆESLAVA HOLJEVCA FROM SORTINA ULICA TO HORVATOVA ULICA WITH MUNICIPAL INFRASTRUCTURE

PHASE 1 - CONSTRUCTION OF THE CITY AVENUE (EASTERN BYPASS) OF THE CITY OF ZAPREŠIĆ WITH MUNICIPAL INFRASTRUCTURE ON THE SECTION FROM RUŠEVJE STREET TO KRAPINSKA ULICA

CONCEPTUAL DESIGN - ULICA GRADA GOSPIĆA EXTENDED FROM ULICA GRADA VUKOVARA TO ULICA DRAGUTINA MANDLA WITH MUNICIPAL INFRASTRUCTURE

CONCEPTUAL SOLUTION FOR THE RECONSTRUCTION OF THE INTERSECTION – TOPUSKO ROUNDABOUT

BOŽJAKOVINA BRIDGE REPAIR PROJECT ON COUNTY ROAD ŽC3034 AT KM 6 914

DESIGN OF THE BELOVAR II BRIDGE ON THE STATE ROAD DC3/010 AT KM 7

DESIGN OF THE VOLODERAC CULVERT

DESIGN OF THE BRIDGE IN ULICA VLADKA MAČEKA IN PETRINJA

CONSTRUCTION OF WATER SUPPLY PIPELINE IN THE ROAD BED OF THE STATE ROAD DC36

CONSTRUCTION OF WATER SUPPLY PIPELINE IN BRODARCI, KARLOVAC

LANDSLIDE REPAIR IN ULICA MILKE TRNINE, RETAINING WALL AND ROADWAY

LANDSLIDE REPAIR IN TRG SVETOG KRIŽA, RETAINING WALL AND ROADWAY